The Sitapur 250 MW Solar-BESS Project
11 Jun 2026
Consider the following statements regarding the Sitapur Solar-BESS Project: It is a utility-scale renewable energy facility utilizing unused defense land. The project is executed by NTPC Limited through a competitive bidding mechanism. Which of the statements given above is/are correct?
- 1 only
- 2 only
- Both 1 and 2
- Neither 1 nor 2
Practice questions are answered inside your account. Create a free account, or see what practice includes.
Which of the following institutions or ministries gave the approval for setting up the 250 MW Solar-BESS Project in Sitapur, Uttar Pradesh?
- Ministry of New and Renewable Energy
- Union Raksha Mantri (Ministry of Defence)
- Ministry of Power
- NITI Aayog
Practice questions are answered inside your account. Create a free account, or see what practice includes.
Consider the following features of the Sitapur Solar-BESS Project: It provides dedicated green power exclusively for civilian commercial distribution networks. It utilizes approximately 850 acres of unused defense land. Which of the statements given above is/are correct?
- 1 only
- 2 only
- Both 1 and 2
- Neither 1 nor 2
Practice questions are answered inside your account. Create a free account, or see what practice includes.
In the context of the operational mechanism of the Sitapur project, what role does a Battery Management System (BMS) play?
- It coordinates land acquisition and tariff bidding processes with NTPC.
- It constantly tracks battery condition, temperature, and charge status to maintain safe functioning.
- It transforms alternating current directly into high-voltage transmission lines.
- It regulates solar radiation capture by physically repositioning photovoltaic panels.
Practice questions are answered inside your account. Create a free account, or see what practice includes.